Showing 1–12 of 16 results
-
4,470.00 $
Colour: |
White |
Dimension: |
197(h) x 70(w) x 85(d) cm |
Compatible with: |
Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
Availability: |
Ex-stock (till stock last) |
-
4,496.00 $
Colour: |
Black |
Dimension: |
197(h) x 110(w) x 85(d) cm |
Compatible with: |
Easy UPS 3-Phase Modular |
Availability: |
Ex-stock (till stock last) |
-
5,177.00 $
Colour: |
White |
Dimension: |
197(h) x 110(w) x 85(d) cm |
Compatible with: |
Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
Availability: |
Ex-stock (till stock last) |
-
38,420.00 $
Type: |
Battery cabinet with VRLA batteries |
Compatible with: |
Easy UPS 3M UPS and Easy UPS 3L UPS |
Dimension: |
189.5(h) x 200.4(w) x 84.5(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
10 weeks |
-
2,230.00 $ – 2,850.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
48U |
Availability: |
Ex-stock |
Dimension: |
2258(h) x 600(w) x Choose(d) cm |
-
2,620.00 $ – 3,340.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
48U |
Availability: |
Ex-stock |
Dimension: |
2258(h) x 800(w) x Choose(d) cm |
-
6,240.00 $
Colour: |
Black |
Physical: |
225.8(h) x 75(w) x 120(d) cm (48U) |
Weight: |
185.45kg |
Product Type: |
Rack Enclosure |
Number Of Rack Unit: |
48U |
Availability: |
Ex-stock |
-
1,412.00 $ – 1,618.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
12U |
Availability: |
Ex-stock |
Dimension: |
65.8(h) x 60(w) x Choose(d) cm |
-
4,120.00 $
Colour: |
Black |
Physical: |
212.4(h) x 60(w) x 120(d) cm (45U) |
Weight: |
141kg |
Product Type: |
Rack Enclosure |
Number Of Rack Unit: |
45U |
Availability: |
Ex-stock |
-
3,540.00 $ – 4,610.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
48U |
Availability: |
Ex-stock |
Dimension: |
225.8(h) x 60(w) x Choose(d) cm |
-
610.00 $
Compatible with: |
Smart-UPS SMC 2000I |
Colour: |
Black |
Dimension: |
8.3(h) x 21.6(w) x 34.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (8 – 12 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…