Showing 1–12 of 15 results
-
18,530.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
External battery system |
Availability: |
8 – 10 Weeks |
-
55,913.00 $ – 65,177.00 $
Colour: |
White |
Dimension: |
197(h) x 55(w) x 84.7(d) cm |
Type: |
UPS with internal battery strings |
Availability: |
Ex-stock |
Backup time: |
Choose (mins) |
-
35,430.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
UPS with external batteries |
Availability: |
Ex-stock |
-
2,060.00 $ – 2,350.00 $
Colour: |
Black |
Physical: |
8.5(h) x 43.2(w) x 50.5(d) cm (2U) |
Mounting Mode: |
Rack Mounted |
Mount Location: |
Front |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
Network Card: |
Choose (Optional) |
-
5,409.00 $ – 6,060.00 $
Colour: |
Black |
Physical: |
17.5(h) x 44(w) x 62(d) cm (4U) |
Mounting Mode: |
Rack Mounted / Tower |
Mount Location: |
Front |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
7,070.00 $ – 7,463.00 $
Colour: |
Black |
Physical: |
21.7(h) x 44(w) x 68(d)cm (5U) |
Mounting Mode: |
Rack Mounted / Tower |
Mount Location: |
Front |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
15,510.00 $ – 17,400.00 $
Colour: |
Black |
Physical: |
30.6(h) x 44(w) x 70(d)cm (7U) |
Mounting Mode: |
Rack Mounted / Tower |
Mount Location: |
Front |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
1,412.00 $ – 1,618.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
12U |
Availability: |
Ex-stock |
Dimension: |
65.8(h) x 60(w) x Choose(d) cm |
-
586.00 $
Colour: |
Black |
Dimension: |
161.9(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Mounting Position: |
Vertical |
Availability: |
Ex-stock (4 – 6 Weeks) |
-
572.00 $
Compatible With: |
Smart-UPS series (SRT, SMT, SMX, SURT, SUM
SURTD), Symmetra series (SYA, SYAF) |
Physical: |
3.8(h) x 12.1(w) x 11.4(d) cm |
Weight: |
0.08kg |
Availability: |
Back order (6 – 8 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |