Maintenance Bypass Panel, single unit, 10-400kVA 400V wall mount, for Easy UPS 3-Phase
5,395.00 $Compatible with: | Easy UPS 3-Phase |
Colour: | White |
Mounting Type: | Wall Mount |
Dimension: | 105(h) x 75(w) x 35(d) cm |
Availability: | In stock |
Showing all 8 results
Compatible with: | Easy UPS 3-Phase |
Colour: | White |
Mounting Type: | Wall Mount |
Dimension: | 105(h) x 75(w) x 35(d) cm |
Availability: | In stock |
Additional Backup Time: | 10 Minutes |
Physical: | 33.6 (h) x 19 (w) x 42.5cm (d) (2U) |
Weight: | 38kg |
Rail Kit: | Tower Case |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Additional Backup Time: | 30 Minutes |
Physical: | 8.6 (h) x 43.8 (w) x 41.2cm (d) (2U) |
Weight: | 21kg |
Rail Kit: | Included |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Colour: | Black |
Dimension: | 90.2(h) x 5.6(w) x 4.4(d) cm |
U Size: | 0U |
Mounting Mode: | Rack Mountable |
Mounting Location: | Side |
Availability: | Ex-stock (2 – 4 Weeks) |
Colour: | Black |
U Size: | 1U |
Mounting Mode: | Rack Mountable |
Mounting Location: | Front / Rear |
Availability: | Ex-stock (6 – 8 Weeks) |
Output: | Choose (C13) |
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
Type: | Maintenance |
Support: | Easy UPS 3S |
Availability: | Ex-stock |
UPS rating: | Choose (kVA) |
Type: | Replacement battery cartridge |
Dimension: | 7.6(h) x 21.6(w) x 53.3(d) cm |
Mounting Mode: | Not rack-mountable |
Availability: | Ex-stock (6 – 8 Weeks) |