-
18,530.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
External battery system |
Availability: |
8 – 10 Weeks |
-
55,913.00 $ – 65,177.00 $
Colour: |
White |
Dimension: |
197(h) x 55(w) x 84.7(d) cm |
Type: |
UPS with internal battery strings |
Availability: |
Ex-stock |
Backup time: |
Choose (mins) |
-
35,430.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
UPS with external batteries |
Availability: |
Ex-stock |
-
1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-
1,520.00 $
Colour: |
Black |
Dimension: |
90.2(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Availability: |
Ex-stock (2 – 4 Weeks) |
-
586.00 $
Colour: |
Black |
Dimension: |
161.9(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Mounting Position: |
Vertical |
Availability: |
Ex-stock (4 – 6 Weeks) |
-
185.00 $ – 433.00 $
Colour: |
Black |
U Size: |
1U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Front / Rear |
Availability: |
Ex-stock (6 – 8 Weeks) |
Output: |
Choose (C13) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |
-
464.00 $
Type: |
Replacement battery cartridge |
Dimension: |
7.6(h) x 21.6(w) x 53.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (6 – 8 Weeks) |