-
131,662.00 $
Colour: |
White |
Dimension: |
197(h) x 85(w) x 92.5(d) cm |
Battery Runtime: |
13.5 mins |
Availability: |
Ex-stock (Special order) |
-
155,313.00 $
Colour: |
White |
Dimension: |
197(h) x 85(w) x 92.5(d) cm |
Battery Runtime: |
10 mins |
Availability: |
Ex-stock (Special order) |
-
1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-
1,800.00 $
Colour: |
Black |
Dimension: |
43.2(h) x 13(w) x 68.27(d) cm |
Mounting Mode: |
Rack-mounted with kit |
Compatible with: |
SRT5KRMXLW-HW |
Availability: |
Ex-stock |
-
528.00 $
Additional Backup Time: |
10 Minutes |
Physical: |
33.6 (h) x 19 (w) x 42.5cm (d) (2U) |
Weight: |
38kg |
Rail Kit: |
Tower Case |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
415.00 $
Additional Backup Time: |
30 Minutes |
Physical: |
8.6 (h) x 43.8 (w) x 41.2cm (d) (2U) |
Weight: |
21kg |
Rail Kit: |
Included |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
464.00 $
Type: |
Replacement battery cartridge |
Dimension: |
7.6(h) x 21.6(w) x 53.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (6 – 8 Weeks) |
-
995.00 $ – 1,990.00 $
Compatible with: |
SURTD5000XLI, SURT192XLBP, SURT3000XLI |
Dimension: |
12.2(h) x 19.7(w) x 59.7(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (4 – 8 Weeks) |
UPS Model: |
Choose |