Showing 1–12 of 39 results
-
5,395.00 $
Compatible with: |
Easy UPS 3-Phase |
Colour: |
White |
Mounting Type: |
Wall Mount |
Dimension: |
105(h) x 75(w) x 35(d) cm |
Availability: |
In stock |
-
20,164.00 $
Compatible with: |
Galaxy VL |
Colour: |
White |
Dimension: |
197(h) x 50(w) x 84.7(d) cm |
Availability: |
8 Weeks (Until stock last) |
-
1,853.00 $ – 2,044.00 $
Compatible with: |
Galaxy VS and Easy UPS 3S |
Colour: |
White |
Mounting Type: |
Wall Mount |
Availability: |
Back order (4 – 8 Weeks) |
Load: |
Choose |
-
8,085.00 $
Compatible with: |
Galaxy VS, Easy 3S and Easy 3M UPS |
Colour: |
White |
Mounting Type: |
Wall Mount |
Availability: |
Back order (4 – 8 Weeks) |
-
1,520.00 $
Colour: |
Black |
Dimension: |
90.2(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Availability: |
Ex-stock (2 – 4 Weeks) |
-
586.00 $
Colour: |
Black |
Dimension: |
161.9(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Mounting Position: |
Vertical |
Availability: |
Ex-stock (4 – 6 Weeks) |
-
185.00 $ – 433.00 $
Colour: |
Black |
U Size: |
1U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Front / Rear |
Availability: |
Ex-stock (6 – 8 Weeks) |
Output: |
Choose (C13) |
-
2,180.00 $
Colour: |
Black |
Physical: |
4.4(h) x 43.2(w) x 23.6(d) cm (1U) |
Weight: |
3.93kg |
Mount Location: |
Front |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
1,880.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
3 weeks |
-
2,234.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock |
-
610.00 $
Compatible with: |
Smart-UPS SMC 2000I |
Colour: |
Black |
Dimension: |
8.3(h) x 21.6(w) x 34.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (8 – 12 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…