Showing 1–12 of 18 results
-
25,040.00 $
Colour: |
White |
Physical: |
197(h) x 60(w) x 100(d) cm |
Battery Type: |
4 internal 9Ah modular battery strings |
Battery Extension: |
Expandable to 6 strings for extended runtime |
Run time: |
13.5 minutes |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
23,140.00 $
Colour: |
White |
Physical: |
197(h) x 60(w) x 100(d) cm |
Battery Type: |
3 internal 9Ah modular battery strings |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
17,460.00 $ – 20,960.00 $
Colour: |
White |
Physical: |
197(h) x 60(w) x 100(d) cm |
Type: |
Internal battery system (Supplied without batteries) |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
15,880.00 $ – 19,050.00 $
Colour: |
White |
Physical: |
91.5(h) x 36(w) x 85(d) cm |
Type: |
External battery system (Supplied without batteries) |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
32,310.00 $
Colour: |
White |
Physical: |
197(h) x 60(w) x 100(d) cm |
Battery Type: |
6 internal 9Ah modular battery strings |
Run time: |
16 minutes |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
28,530.00 $
Colour: |
White |
Physical: |
197(h) x 60(w) x 100(d) cm |
Battery Type: |
4 internal 9Ah modular battery strings |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
40,436.00 $
Colour: |
White |
Physical: |
130(h) x 60(w) x 85(d) cm |
Type: |
External battery system |
Availability: |
12 – 16 weeks |
-
2,180.00 $
Colour: |
Black |
Physical: |
4.4(h) x 43.2(w) x 23.6(d) cm (1U) |
Weight: |
3.93kg |
Mount Location: |
Front |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
572.00 $
Compatible With: |
Smart-UPS series (SRT, SMT, SMX, SURT, SUM
SURTD), Symmetra series (SYA, SYAF) |
Physical: |
3.8(h) x 12.1(w) x 11.4(d) cm |
Weight: |
0.08kg |
Availability: |
Back order (6 – 8 Weeks) |
-
610.00 $
Compatible with: |
Smart-UPS SMC 2000I |
Colour: |
Black |
Dimension: |
8.3(h) x 21.6(w) x 34.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (8 – 12 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |