Showing 1–12 of 13 results
-
18,530.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
External battery system |
Availability: |
8 – 10 Weeks |
-
55,913.00 $ – 65,177.00 $
Colour: |
White |
Dimension: |
197(h) x 55(w) x 84.7(d) cm |
Type: |
UPS with internal battery strings |
Availability: |
Ex-stock |
Backup time: |
Choose (mins) |
-
35,430.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
UPS with external batteries |
Availability: |
Ex-stock |
-
1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-
1,800.00 $
Colour: |
Black |
Dimension: |
43.2(h) x 13(w) x 68.27(d) cm |
Mounting Mode: |
Rack-mounted with kit |
Compatible with: |
SRT5KRMXLW-HW |
Availability: |
Ex-stock |
-
528.00 $
Additional Backup Time: |
10 Minutes |
Physical: |
33.6 (h) x 19 (w) x 42.5cm (d) (2U) |
Weight: |
38kg |
Rail Kit: |
Tower Case |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
415.00 $
Additional Backup Time: |
30 Minutes |
Physical: |
8.6 (h) x 43.8 (w) x 41.2cm (d) (2U) |
Weight: |
21kg |
Rail Kit: |
Included |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
4,120.00 $
Colour: |
Black |
Physical: |
212.4(h) x 60(w) x 120(d) cm (45U) |
Weight: |
141kg |
Product Type: |
Rack Enclosure |
Number Of Rack Unit: |
45U |
Availability: |
Ex-stock |
-
2,180.00 $
Colour: |
Black |
Physical: |
4.4(h) x 43.2(w) x 23.6(d) cm (1U) |
Weight: |
3.93kg |
Mount Location: |
Front |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
44.00 $
Compatible With: |
Single Phase Easy SRV 5KVA models and above |
Physical: |
2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
80.00 $
Compatible With: |
Single Phase Easy SRV models only |
Physical: |
2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…