-

1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-

2,180.00 $
Colour: |
Black |
Physical: |
4.4(h) x 43.2(w) x 23.6(d) cm (1U) |
Weight: |
3.93kg |
Mount Location: |
Front |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-

3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-

995.00 $ – 1,990.00 $
Compatible with: |
SURTD5000XLI, SURT192XLBP, SURT3000XLI |
Dimension: |
12.2(h) x 19.7(w) x 59.7(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (4 – 8 Weeks) |
UPS Model: |
Choose |
-

642.00 $
Compatible with: |
Galaxy VS, Easy 3-Phase Modular, and Galaxy PX |
Type: |
Kit |
Dimension: |
13.5(h) x 45.5(w) x 33(d) cm |
Availability: |
Ex-stock (4 – 8 Weeks) |