-
2,180.00 $
Colour: |
Black |
Physical: |
4.4(h) x 43.2(w) x 23.6(d) cm (1U) |
Weight: |
3.93kg |
Mount Location: |
Front |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
44.00 $
Compatible With: |
Single Phase Easy SRV 5KVA models and above |
Physical: |
2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
80.00 $
Compatible With: |
Single Phase Easy SRV models only |
Physical: |
2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
433.00 $
Compatible With: |
Easy 3S, 3M, 3L and Galaxy PW 2nd Gen UPS |
Physical: |
12.7(h) x 20.3(w) x 12.7(d) cm |
Weight: |
0.91kg |
Availability: |
Back order (6 – 8 Weeks) |
-
600.00 $
Compatible With: |
Easy UPS 3S, Easy UPS 3M, Easy UPS 3L |
Physical: |
4.4(h) x 5.2(w) x 8.0(d) cm |
Weight: |
0.05kg |
Availability: |
Ex-stock until stock last (5 Weeks) |
-
1,880.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
3 weeks |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |
-
65.50 $
Type: |
VRLA |
Colour: |
Black |
Dimension: |
9.4(h) x 6.5(w) x 15.1(d) cm |
Availability: |
Ex-stock |