-
1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-
2,123.00 $ – 2,260.00 $
Colour: |
Black |
U Size: |
1U |
Mount Location: |
Front |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
433.00 $
Compatible With: |
Easy 3S, 3M, 3L and Galaxy PW 2nd Gen UPS |
Physical: |
12.7(h) x 20.3(w) x 12.7(d) cm |
Weight: |
0.91kg |
Availability: |
Back order (6 – 8 Weeks) |
-
600.00 $
Compatible With: |
Easy UPS 3S, Easy UPS 3M, Easy UPS 3L |
Physical: |
4.4(h) x 5.2(w) x 8.0(d) cm |
Weight: |
0.05kg |
Availability: |
Ex-stock until stock last (5 Weeks) |
-
610.00 $
Compatible with: |
Smart-UPS SMC 2000I |
Colour: |
Black |
Dimension: |
8.3(h) x 21.6(w) x 34.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (8 – 12 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |
-
245.70 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
22.4(h) x 17.6(w) x 41.0(d) cm |
Availability: |
Ex-stock |
-
317.20 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
24.0(h) x 17.0(w) x 48.2(d) cm |
Availability: |
Ex-stock |
-
45.50 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
16.7(h) x 7.7(w) x 18.1(d) cm |
Availability: |
Ex-stock |
-
763.00 $
Compatible with: |
SUA2200I and Other UPS |
Colour: |
Black |
Dimension: |
17.3(h) x 14.2(w) x 18.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (8 – 12 Weeks) |