-
2,060.00 $ – 2,350.00 $
Colour: |
Black |
Physical: |
8.5(h) x 43.2(w) x 50.5(d) cm (2U) |
Mounting Mode: |
Rack Mounted |
Mount Location: |
Front |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
Network Card: |
Choose (Optional) |
-
5,409.00 $ – 6,060.00 $
Colour: |
Black |
Physical: |
17.5(h) x 44(w) x 62(d) cm (4U) |
Mounting Mode: |
Rack Mounted / Tower |
Mount Location: |
Front |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
7,070.00 $ – 7,463.00 $
Colour: |
Black |
Physical: |
21.7(h) x 44(w) x 68(d)cm (5U) |
Mounting Mode: |
Rack Mounted / Tower |
Mount Location: |
Front |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
15,510.00 $ – 17,400.00 $
Colour: |
Black |
Physical: |
30.6(h) x 44(w) x 70(d)cm (7U) |
Mounting Mode: |
Rack Mounted / Tower |
Mount Location: |
Front |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
2,123.00 $ – 2,260.00 $
Colour: |
Black |
U Size: |
1U |
Mount Location: |
Front |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |
-
995.00 $ – 1,990.00 $
Compatible with: |
SURTD5000XLI, SURT192XLBP, SURT3000XLI |
Dimension: |
12.2(h) x 19.7(w) x 59.7(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (4 – 8 Weeks) |
UPS Model: |
Choose |