-

1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-

572.00 $
Compatible With: |
Smart-UPS series (SRT, SMT, SMX, SURT, SUM
SURTD), Symmetra series (SYA, SYAF) |
Physical: |
3.8(h) x 12.1(w) x 11.4(d) cm |
Weight: |
0.08kg |
Availability: |
Back order (6 – 8 Weeks) |
-

3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-

245.70 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
22.4(h) x 17.6(w) x 41.0(d) cm |
Availability: |
Ex-stock |
-

68.90 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
12.5(h) x 17.5(w) x 16.6(d) cm |
Availability: |
Ex-stock |
-

313.00 $
Compatible with: |
SRT1000XLI, SRT1500XLI, SRT2200XLI,
SRT3000XLI and other SRT Series UPS |
Physical: |
4.4(h) x 52.7(w) x 8.9(d) cm |
Weight: |
2.72kg |
Mounting Mode: |
Rack mounted |
Availability: |
Ex-stock / back order 4-6 weeks |