-
44.00 $
Compatible With: |
Single Phase Easy SRV 5KVA models and above |
Physical: |
2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
80.00 $
Compatible With: |
Single Phase Easy SRV models only |
Physical: |
2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
572.00 $
Compatible With: |
Smart-UPS series (SRT, SMT, SMX, SURT, SUM
SURTD), Symmetra series (SYA, SYAF) |
Physical: |
3.8(h) x 12.1(w) x 11.4(d) cm |
Weight: |
0.08kg |
Availability: |
Back order (6 – 8 Weeks) |
-
433.00 $
Compatible With: |
Easy 3S, 3M, 3L and Galaxy PW 2nd Gen UPS |
Physical: |
12.7(h) x 20.3(w) x 12.7(d) cm |
Weight: |
0.91kg |
Availability: |
Back order (6 – 8 Weeks) |
-
600.00 $
Compatible With: |
Easy UPS 3S, Easy UPS 3M, Easy UPS 3L |
Physical: |
4.4(h) x 5.2(w) x 8.0(d) cm |
Weight: |
0.05kg |
Availability: |
Ex-stock until stock last (5 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
245.70 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
22.4(h) x 17.6(w) x 41.0(d) cm |
Availability: |
Ex-stock |