Showing 1–12 of 39 results
-
1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-
1,800.00 $
Colour: |
Black |
Dimension: |
43.2(h) x 13(w) x 68.27(d) cm |
Mounting Mode: |
Rack-mounted with kit |
Compatible with: |
SRT5KRMXLW-HW |
Availability: |
Ex-stock |
-
528.00 $
Additional Backup Time: |
10 Minutes |
Physical: |
33.6 (h) x 19 (w) x 42.5cm (d) (2U) |
Weight: |
38kg |
Rail Kit: |
Tower Case |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
415.00 $
Additional Backup Time: |
30 Minutes |
Physical: |
8.6 (h) x 43.8 (w) x 41.2cm (d) (2U) |
Weight: |
21kg |
Rail Kit: |
Included |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
1,816.00 $ – 2,460.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
24U |
Availability: |
Ex-stock |
Dimension: |
1198(h) x 600(w) x Choose(d) cm |
-
1,412.00 $ – 1,618.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
12U |
Availability: |
Ex-stock |
Dimension: |
65.8(h) x 60(w) x Choose(d) cm |
-
2,540.00 $
Colour: |
Black |
Physical: |
119.85(h) x 60(w) x 107(d) cm (24U) |
Weight: |
89.09kg |
Product Type: |
Rack Enclosure |
Number Of Rack Unit: |
24U |
Availability: |
Ex-stock |
-
4,120.00 $
Colour: |
Black |
Physical: |
212.4(h) x 60(w) x 120(d) cm (45U) |
Weight: |
141kg |
Product Type: |
Rack Enclosure |
Number Of Rack Unit: |
45U |
Availability: |
Ex-stock |
-
1,880.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
3 weeks |
-
2,234.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock |
-
610.00 $
Compatible with: |
Smart-UPS SMC 2000I |
Colour: |
Black |
Dimension: |
8.3(h) x 21.6(w) x 34.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (8 – 12 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…