Showing 1–12 of 17 results
-
5,395.00 $
Compatible with: |
Easy UPS 3-Phase |
Colour: |
White |
Mounting Type: |
Wall Mount |
Dimension: |
105(h) x 75(w) x 35(d) cm |
Availability: |
In stock |
-
20,164.00 $
Compatible with: |
Galaxy VL |
Colour: |
White |
Dimension: |
197(h) x 50(w) x 84.7(d) cm |
Availability: |
8 Weeks (Until stock last) |
-
1,853.00 $ – 2,044.00 $
Compatible with: |
Galaxy VS and Easy UPS 3S |
Colour: |
White |
Mounting Type: |
Wall Mount |
Availability: |
Back order (4 – 8 Weeks) |
Load: |
Choose |
-
8,085.00 $
Compatible with: |
Galaxy VS, Easy 3S and Easy 3M UPS |
Colour: |
White |
Mounting Type: |
Wall Mount |
Availability: |
Back order (4 – 8 Weeks) |
-
1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-
27,184.00 $
Physical: |
155.4(h) x 100.1(w) x 100.1(d) cm |
Input Voltage: |
400 V |
Compatible Indoor Units: |
ACRD301S and ACRD301P |
Availability: |
12 weeks (Ex-stock until stock last) |
-
22,956.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
Input Power: |
850 W |
Compatible Outdoor Unit: |
ACCU30201 |
Compatible Sensing Cable: |
NBES0308 |
Availability: |
12 weeks (Ex-stock until stock last) |
-
25,440.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
Input Power: |
850 W |
Compatible Outdoor Unit: |
ACCU30201 |
Compatible Sensing Cable: |
NBES0308 |
Availability: |
12 weeks (Ex-stock until stock last) |
-
2,123.00 $ – 2,260.00 $
Colour: |
Black |
U Size: |
1U |
Mount Location: |
Front |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
433.00 $
Compatible With: |
Easy 3S, 3M, 3L and Galaxy PW 2nd Gen UPS |
Physical: |
12.7(h) x 20.3(w) x 12.7(d) cm |
Weight: |
0.91kg |
Availability: |
Back order (6 – 8 Weeks) |
-
600.00 $
Compatible With: |
Easy UPS 3S, Easy UPS 3M, Easy UPS 3L |
Physical: |
4.4(h) x 5.2(w) x 8.0(d) cm |
Weight: |
0.05kg |
Availability: |
Ex-stock until stock last (5 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…