-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |
-
317.20 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
24.0(h) x 17.0(w) x 48.2(d) cm |
Availability: |
Ex-stock |
-
436.00 $
Type: |
Battery |
Color: |
Grey |
Physical: |
23.9(h) x 17.2(w) x 30.9(d) cm |
Availability: |
6 – 8 weeks |
-
995.00 $ – 1,990.00 $
Compatible with: |
SURTD5000XLI, SURT192XLBP, SURT3000XLI |
Dimension: |
12.2(h) x 19.7(w) x 59.7(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (4 – 8 Weeks) |
UPS Model: |
Choose |
-
313.00 $
Compatible with: |
SRT1000XLI, SRT1500XLI, SRT2200XLI,
SRT3000XLI and other SRT Series UPS |
Physical: |
4.4(h) x 52.7(w) x 8.9(d) cm |
Weight: |
2.72kg |
Mounting Mode: |
Rack mounted |
Availability: |
Ex-stock / back order 4-6 weeks |
-
33.00 $
Primary Models: |
SRV1KRILRK & SRV36RLBP-9A |
Weight: |
0.295kg |
Availability: |
Ex-stock / back order 4-6 weeks |