Showing 1–12 of 16 results
-
1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-
1,912.00 $ – 2,590.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
42U |
Availability: |
Ex-stock |
Dimension: |
1991(h) x 600(w) x Choose(d) cm |
-
2,250.00 $ – 3,040.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
42U |
Availability: |
Ex-stock |
Dimension: |
1991(h) x 800(w) x Choose(d) cm |
-
5,030.00 $ – 5,340.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
42U |
Availability: |
Ex-stock |
Dimension: |
1991(h) x 750(w) x Choose(d) cm |
-
2,960.00 $ – 3,880.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
42U |
Availability: |
Ex-stock |
Dimension: |
199.1(h) x 60(w) x Choose(d) cm |
-
3,660.00 $ – 4,930.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
42U |
Availability: |
Ex-stock |
Dimension: |
199.1(h) x 75(w) x Choose(d) cm |
-
1,520.00 $
Colour: |
Black |
Dimension: |
90.2(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Availability: |
Ex-stock (2 – 4 Weeks) |
-
185.00 $ – 433.00 $
Colour: |
Black |
U Size: |
1U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Front / Rear |
Availability: |
Ex-stock (6 – 8 Weeks) |
Output: |
Choose (C13) |
-
433.00 $
Compatible With: |
Easy 3S, 3M, 3L and Galaxy PW 2nd Gen UPS |
Physical: |
12.7(h) x 20.3(w) x 12.7(d) cm |
Weight: |
0.91kg |
Availability: |
Back order (6 – 8 Weeks) |
-
600.00 $
Compatible With: |
Easy UPS 3S, Easy UPS 3M, Easy UPS 3L |
Physical: |
4.4(h) x 5.2(w) x 8.0(d) cm |
Weight: |
0.05kg |
Availability: |
Ex-stock until stock last (5 Weeks) |
-
610.00 $
Compatible with: |
Smart-UPS SMC 2000I |
Colour: |
Black |
Dimension: |
8.3(h) x 21.6(w) x 34.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (8 – 12 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…