Showing 1–12 of 40 results
-
4,470.00 $
Colour: |
White |
Dimension: |
197(h) x 70(w) x 85(d) cm |
Compatible with: |
Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
Availability: |
Ex-stock (till stock last) |
-
4,496.00 $
Colour: |
Black |
Dimension: |
197(h) x 110(w) x 85(d) cm |
Compatible with: |
Easy UPS 3-Phase Modular |
Availability: |
Ex-stock (till stock last) |
-
5,177.00 $
Colour: |
White |
Dimension: |
197(h) x 110(w) x 85(d) cm |
Compatible with: |
Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
Availability: |
Ex-stock (till stock last) |
-
38,420.00 $
Type: |
Battery cabinet with VRLA batteries |
Compatible with: |
Easy UPS 3M UPS and Easy UPS 3L UPS |
Dimension: |
189.5(h) x 200.4(w) x 84.5(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
10 weeks |
-
1,800.00 $
Colour: |
Black |
Dimension: |
43.2(h) x 13(w) x 68.27(d) cm |
Mounting Mode: |
Rack-mounted with kit |
Compatible with: |
SRT5KRMXLW-HW |
Availability: |
Ex-stock |
-
20,273.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
U Size: |
42U |
Mounting Mode: |
Not rack-mountable |
Availability: |
13 weeks (Ex-stock until stock last) |
-
1,520.00 $
Colour: |
Black |
Dimension: |
90.2(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Availability: |
Ex-stock (2 – 4 Weeks) |
-
185.00 $ – 433.00 $
Colour: |
Black |
U Size: |
1U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Front / Rear |
Availability: |
Ex-stock (6 – 8 Weeks) |
Output: |
Choose (C13) |
-
1,880.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
3 weeks |
-
2,234.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock |
-
610.00 $
Compatible with: |
Smart-UPS SMC 2000I |
Colour: |
Black |
Dimension: |
8.3(h) x 21.6(w) x 34.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (8 – 12 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…