Battery Breaker Box, 630A, one circuit breaker for Easy UPS 3M/3L
3,106.00 $Colour: | White |
Dimension: | 80(h) x 50(w) x 28(d) cm |
Mounting Type: | Wall mounted |
Availability: | 12 – 16 Weeks from order |
Showing all 5 results
Colour: | White |
Dimension: | 80(h) x 50(w) x 28(d) cm |
Mounting Type: | Wall mounted |
Availability: | 12 – 16 Weeks from order |
Colour: | Black |
Dimension: | 90.2(h) x 5.6(w) x 4.4(d) cm |
U Size: | 0U |
Mounting Mode: | Rack Mountable |
Mounting Location: | Side |
Availability: | Ex-stock (2 – 4 Weeks) |
Colour: | Black |
Dimension: | 161.9(h) x 5.6(w) x 4.4(d) cm |
U Size: | 0U |
Mounting Mode: | Rack Mountable |
Mounting Location: | Side |
Mounting Position: | Vertical |
Availability: | Ex-stock (4 – 6 Weeks) |
Colour: | Black |
U Size: | 1U |
Mounting Mode: | Rack Mountable |
Mounting Location: | Front / Rear |
Availability: | Ex-stock (6 – 8 Weeks) |
Output: | Choose (C13) |
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…