Showing 61–68 of 68 results
-
639.00 $
Additional Backup Time: |
10 Minutes |
Physical: |
13.3 (h) x 43.8 (w) x 60.6cm (d) (3U) |
Weight: |
63kg |
Rail Kit: |
Included |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
4,120.00 $
Colour: |
Black |
Physical: |
212.4(h) x 60(w) x 120(d) cm (45U) |
Weight: |
141kg |
Product Type: |
Rack Enclosure |
Number Of Rack Unit: |
45U |
Availability: |
Ex-stock |
-
1,520.00 $
Colour: |
Black |
Dimension: |
90.2(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Availability: |
Ex-stock (2 – 4 Weeks) |
-
185.00 $ – 433.00 $
Colour: |
Black |
U Size: |
1U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Front / Rear |
Availability: |
Ex-stock (6 – 8 Weeks) |
Output: |
Choose (C13) |
-
572.00 $
Compatible With: |
Smart-UPS series (SRT, SMT, SMX, SURT, SUM
SURTD), Symmetra series (SYA, SYAF) |
Physical: |
3.8(h) x 12.1(w) x 11.4(d) cm |
Weight: |
0.08kg |
Availability: |
Back order (6 – 8 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |
-
313.00 $
Compatible with: |
SRT1000XLI, SRT1500XLI, SRT2200XLI,
SRT3000XLI and other SRT Series UPS |
Physical: |
4.4(h) x 52.7(w) x 8.9(d) cm |
Weight: |
2.72kg |
Mounting Mode: |
Rack mounted |
Availability: |
Ex-stock / back order 4-6 weeks |