Showing 1–12 of 13 results
-
20,164.00 $
Compatible with: |
Galaxy VL |
Colour: |
White |
Dimension: |
197(h) x 50(w) x 84.7(d) cm |
Availability: |
8 Weeks (Until stock last) |
-
27,184.00 $
Physical: |
155.4(h) x 100.1(w) x 100.1(d) cm |
Input Voltage: |
400 V |
Compatible Indoor Units: |
ACRD301S and ACRD301P |
Availability: |
12 weeks (Ex-stock until stock last) |
-
22,956.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
Input Power: |
850 W |
Compatible Outdoor Unit: |
ACCU30201 |
Compatible Sensing Cable: |
NBES0308 |
Availability: |
12 weeks (Ex-stock until stock last) |
-
25,440.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
Input Power: |
850 W |
Compatible Outdoor Unit: |
ACCU30201 |
Compatible Sensing Cable: |
NBES0308 |
Availability: |
12 weeks (Ex-stock until stock last) |
-
10,190.00 $
Physical: |
68.6(h) x 90.1(w) x 45.7(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
12 weeks (Ex-stock until stock last) |
-
20,273.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
U Size: |
42U |
Mounting Mode: |
Not rack-mountable |
Availability: |
13 weeks (Ex-stock until stock last) |
-
1,520.00 $
Colour: |
Black |
Dimension: |
90.2(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Availability: |
Ex-stock (2 – 4 Weeks) |
-
185.00 $ – 433.00 $
Colour: |
Black |
U Size: |
1U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Front / Rear |
Availability: |
Ex-stock (6 – 8 Weeks) |
Output: |
Choose (C13) |
-
44.00 $
Compatible With: |
Single Phase Easy SRV 5KVA models and above |
Physical: |
2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
80.00 $
Compatible With: |
Single Phase Easy SRV models only |
Physical: |
2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |