Showing 1–12 of 16 results
-
78,500.00 $
Colour: |
White |
Physical: |
197(h) x 60(w) x 85(d) cm |
Type: |
External battery system |
Battery Runtime: |
13.5 mins (at 400kW unit load) |
Availability: |
Ex-stock until stock last (Special order) |
-
93,243.00 $
Colour: |
White |
Physical: |
197(h) x 100(w) x 85(d) cm |
Type: |
External battery system |
Battery Runtime: |
10 mins (at 500kW unit load) |
Availability: |
Ex-stock until stock last (Special order) |
-
18,530.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
External battery system |
Availability: |
8 – 10 Weeks |
-
55,913.00 $ – 65,177.00 $
Colour: |
White |
Dimension: |
197(h) x 55(w) x 84.7(d) cm |
Type: |
UPS with internal battery strings |
Availability: |
Ex-stock |
Backup time: |
Choose (mins) |
-
35,430.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
UPS with external batteries |
Availability: |
Ex-stock |
-
4,470.00 $
Colour: |
White |
Dimension: |
197(h) x 70(w) x 85(d) cm |
Compatible with: |
Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
Availability: |
Ex-stock (till stock last) |
-
4,496.00 $
Colour: |
Black |
Dimension: |
197(h) x 110(w) x 85(d) cm |
Compatible with: |
Easy UPS 3-Phase Modular |
Availability: |
Ex-stock (till stock last) |
-
5,177.00 $
Colour: |
White |
Dimension: |
197(h) x 110(w) x 85(d) cm |
Compatible with: |
Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
Availability: |
Ex-stock (till stock last) |
-
38,420.00 $
Type: |
Battery cabinet with VRLA batteries |
Compatible with: |
Easy UPS 3M UPS and Easy UPS 3L UPS |
Dimension: |
189.5(h) x 200.4(w) x 84.5(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
10 weeks |
-
586.00 $
Colour: |
Black |
Dimension: |
161.9(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Mounting Position: |
Vertical |
Availability: |
Ex-stock (4 – 6 Weeks) |
-
1,880.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
3 weeks |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…