Battery Breaker Box, two 630A DC breakers, for Galaxy VS/VL, Easy UPS 3-Phase Modular, and Easy UPS 3M Advanced
4,305.00 $Colour: | White |
Dimension: | 100(h) x 75(w) x 28(d) cm |
Mounting Type: | Wall mounted |
Availability: | Ex-stock |
Showing 1–12 of 13 results
Colour: | White |
Dimension: | 100(h) x 75(w) x 28(d) cm |
Mounting Type: | Wall mounted |
Availability: | Ex-stock |
Colour: | Black |
Dimension: | 13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: | Rack-mounted |
U Size: | 3U |
Compatible with: | SRTG10KXLI |
Availability: | Ex-stock |
Colour: | Black |
Dimension: | 43.2(h) x 13(w) x 68.27(d) cm |
Mounting Mode: | Rack-mounted with kit |
Compatible with: | SRT5KRMXLW-HW |
Availability: | Ex-stock |
Additional Backup Time: | 10 Minutes |
Physical: | 33.6 (h) x 19 (w) x 42.5cm (d) (2U) |
Weight: | 38kg |
Rail Kit: | Tower Case |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Additional Backup Time: | 30 Minutes |
Physical: | 8.6 (h) x 43.8 (w) x 41.2cm (d) (2U) |
Weight: | 21kg |
Rail Kit: | Included |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Colour: | Black |
Physical: | 212.4(h) x 60(w) x 120(d) cm (45U) |
Weight: | 141kg |
Product Type: | Rack Enclosure |
Number Of Rack Unit: | 45U |
Availability: | Ex-stock |
Colour: | Black |
Dimension: | 161.9(h) x 5.6(w) x 4.4(d) cm |
U Size: | 0U |
Mounting Mode: | Rack Mountable |
Mounting Location: | Side |
Mounting Position: | Vertical |
Availability: | Ex-stock (4 – 6 Weeks) |
Compatible With: | Single Phase Easy SRV 5KVA models and above |
Physical: | 2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: | 0.1kg |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Compatible With: | Single Phase Easy SRV models only |
Physical: | 2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: | 0.1kg |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Compatible with: | Smart-UPS SMC 2000I |
Colour: | Black |
Dimension: | 8.3(h) x 21.6(w) x 34.3(d) cm |
Mounting Mode: | Not rack-mountable |
Availability: | Ex-stock (8 – 12 Weeks) |
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
Type: | Maintenance |
Support: | Easy UPS 3S |
Availability: | Ex-stock |
UPS rating: | Choose (kVA) |