Battery Breaker Box, two 630A DC breakers, for Galaxy VS/VL, Easy UPS 3-Phase Modular, and Easy UPS 3M Advanced
4,305.00 $Colour: | White |
Dimension: | 100(h) x 75(w) x 28(d) cm |
Mounting Type: | Wall mounted |
Availability: | Ex-stock |
Showing all 7 results
Colour: | White |
Dimension: | 100(h) x 75(w) x 28(d) cm |
Mounting Type: | Wall mounted |
Availability: | Ex-stock |
Colour: | White |
Dimension: | 80(h) x 50(w) x 28(d) cm |
Mounting Type: | Wall mounted |
Availability: | 12 – 16 Weeks from order |
Compatible With: | Single Phase Easy SRV 5KVA models and above |
Physical: | 2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: | 0.1kg |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Compatible With: | Single Phase Easy SRV models only |
Physical: | 2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: | 0.1kg |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Compatible with: | Smart-UPS SMC 2000I |
Colour: | Black |
Dimension: | 8.3(h) x 21.6(w) x 34.3(d) cm |
Mounting Mode: | Not rack-mountable |
Availability: | Ex-stock (8 – 12 Weeks) |
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
Type: | Maintenance |
Support: | Easy UPS 3S |
Availability: | Ex-stock |
UPS rating: | Choose (kVA) |