Showing 1–12 of 19 results
-
18,530.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
External battery system |
Availability: |
8 – 10 Weeks |
-
55,913.00 $ – 65,177.00 $
Colour: |
White |
Dimension: |
197(h) x 55(w) x 84.7(d) cm |
Type: |
UPS with internal battery strings |
Availability: |
Ex-stock |
Backup time: |
Choose (mins) |
-
35,430.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
UPS with external batteries |
Availability: |
Ex-stock |
-
131,662.00 $
Colour: |
White |
Dimension: |
197(h) x 85(w) x 92.5(d) cm |
Battery Runtime: |
13.5 mins |
Availability: |
Ex-stock (Special order) |
-
155,313.00 $
Colour: |
White |
Dimension: |
197(h) x 85(w) x 92.5(d) cm |
Battery Runtime: |
10 mins |
Availability: |
Ex-stock (Special order) |
-
5,395.00 $
Compatible with: |
Easy UPS 3-Phase |
Colour: |
White |
Mounting Type: |
Wall Mount |
Dimension: |
105(h) x 75(w) x 35(d) cm |
Availability: |
In stock |
-
20,164.00 $
Compatible with: |
Galaxy VL |
Colour: |
White |
Dimension: |
197(h) x 50(w) x 84.7(d) cm |
Availability: |
8 Weeks (Until stock last) |
-
1,853.00 $ – 2,044.00 $
Compatible with: |
Galaxy VS and Easy UPS 3S |
Colour: |
White |
Mounting Type: |
Wall Mount |
Availability: |
Back order (4 – 8 Weeks) |
Load: |
Choose |
-
8,085.00 $
Compatible with: |
Galaxy VS, Easy 3S and Easy 3M UPS |
Colour: |
White |
Mounting Type: |
Wall Mount |
Availability: |
Back order (4 – 8 Weeks) |
-
2,234.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock |
-
610.00 $
Compatible with: |
Smart-UPS SMC 2000I |
Colour: |
Black |
Dimension: |
8.3(h) x 21.6(w) x 34.3(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (8 – 12 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…