-
78,500.00 $
Colour: |
White |
Physical: |
197(h) x 60(w) x 85(d) cm |
Type: |
External battery system |
Battery Runtime: |
13.5 mins (at 400kW unit load) |
Availability: |
Ex-stock until stock last (Special order) |
-
93,243.00 $
Colour: |
White |
Physical: |
197(h) x 100(w) x 85(d) cm |
Type: |
External battery system |
Battery Runtime: |
10 mins (at 500kW unit load) |
Availability: |
Ex-stock until stock last (Special order) |
-
131,662.00 $
Colour: |
White |
Dimension: |
197(h) x 85(w) x 92.5(d) cm |
Battery Runtime: |
13.5 mins |
Availability: |
Ex-stock (Special order) |
-
155,313.00 $
Colour: |
White |
Dimension: |
197(h) x 85(w) x 92.5(d) cm |
Battery Runtime: |
10 mins |
Availability: |
Ex-stock (Special order) |
-
4,120.00 $
Colour: |
Black |
Physical: |
212.4(h) x 60(w) x 120(d) cm (45U) |
Weight: |
141kg |
Product Type: |
Rack Enclosure |
Number Of Rack Unit: |
45U |
Availability: |
Ex-stock |
-
586.00 $
Colour: |
Black |
Dimension: |
161.9(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Mounting Position: |
Vertical |
Availability: |
Ex-stock (4 – 6 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |
-
68.90 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
12.5(h) x 17.5(w) x 16.6(d) cm |
Availability: |
Ex-stock |
-
995.00 $ – 1,990.00 $
Compatible with: |
SURTD5000XLI, SURT192XLBP, SURT3000XLI |
Dimension: |
12.2(h) x 19.7(w) x 59.7(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock (4 – 8 Weeks) |
UPS Model: |
Choose |