-

2,613.00 $
Colour: |
Black |
Physical: |
8.8(h) x 43.2(w) x 23.6(d) cm (2U) |
Weight: |
6.94kg |
Mount Location: |
Front / Rear |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-

572.00 $
Compatible With: |
Smart-UPS series (SRT, SMT, SMX, SURT, SUM
SURTD), Symmetra series (SYA, SYAF) |
Physical: |
3.8(h) x 12.1(w) x 11.4(d) cm |
Weight: |
0.08kg |
Availability: |
Back order (6 – 8 Weeks) |
-

3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-

75.40 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
15.5(h) x 13(w) x 19.5(d) cm |
Availability: |
Ex-stock |
-

165.10 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
20.6(h) x 16.6(w) x 25.8(d) cm |
Availability: |
Ex-stock |