-
1,907.00 $
Colour: |
White |
Dimension: |
65(h) x 50(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
8 – 10 Weeks |
-
2,180.00 $
Colour: |
White |
Dimension: |
65(h) x 50(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
8 – 10 Weeks |
-
4,305.00 $
Colour: |
White |
Dimension: |
100(h) x 75(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
Ex-stock |
-
3,106.00 $
Colour: |
White |
Dimension: |
80(h) x 50(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
12 – 16 Weeks from order |
-
2,230.00 $ – 2,850.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
48U |
Availability: |
Ex-stock |
Dimension: |
2258(h) x 600(w) x Choose(d) cm |
-
2,620.00 $ – 3,340.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
48U |
Availability: |
Ex-stock |
Dimension: |
2258(h) x 800(w) x Choose(d) cm |
-
6,240.00 $
Colour: |
Black |
Physical: |
225.8(h) x 75(w) x 120(d) cm (48U) |
Weight: |
185.45kg |
Product Type: |
Rack Enclosure |
Number Of Rack Unit: |
48U |
Availability: |
Ex-stock |
-
3,540.00 $ – 4,610.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
48U |
Availability: |
Ex-stock |
Dimension: |
225.8(h) x 60(w) x Choose(d) cm |
-
2,613.00 $
Colour: |
Black |
Physical: |
8.8(h) x 43.2(w) x 23.6(d) cm (2U) |
Weight: |
6.94kg |
Mount Location: |
Front / Rear |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
44.00 $
Compatible With: |
Single Phase Easy SRV 5KVA models and above |
Physical: |
2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
80.00 $
Compatible With: |
Single Phase Easy SRV models only |
Physical: |
2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…