Easy UPS 3L 400kVA 400V 3:3 UPS, Startup 5×8
78,500.00 $Colour: | White |
Physical: | 197(h) x 60(w) x 85(d) cm |
Type: | External battery system |
Battery Runtime: | 13.5 mins (at 400kW unit load) |
Availability: | Ex-stock until stock last (Special order) |
Showing all 9 results
Colour: | White |
Physical: | 197(h) x 60(w) x 85(d) cm |
Type: | External battery system |
Battery Runtime: | 13.5 mins (at 400kW unit load) |
Availability: | Ex-stock until stock last (Special order) |
Colour: | White |
Physical: | 197(h) x 100(w) x 85(d) cm |
Type: | External battery system |
Battery Runtime: | 10 mins (at 500kW unit load) |
Availability: | Ex-stock until stock last (Special order) |
Colour: | Black |
Physical: | 8.8(h) x 43.2(w) x 23.6(d) cm (2U) |
Weight: | 6.94kg |
Mount Location: | Front / Rear |
Mounting Mode: | Rack-mounted |
Availability: | Ex-stock |
Compatible With: | Single Phase Easy SRV 5KVA models and above |
Physical: | 2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: | 0.1kg |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Compatible With: | Single Phase Easy SRV models only |
Physical: | 2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: | 0.1kg |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
Type: | Maintenance |
Support: | Easy UPS 3S |
Availability: | Ex-stock |
UPS rating: | Choose (kVA) |
Type: | Battery |
Color: | Grey |
Physical: | 23.9(h) x 17.2(w) x 30.9(d) cm |
Availability: | 6 – 8 weeks |
Type: | Water leakage sensor |
Dimension: | 7(h) x 17.1(w) x 16.1(d) cm |
Compatible with: | InRow RC, InRow RD and other NetBotz appliances |
Availability: | 12 – 13 Weeks |