Showing 1–12 of 14 results
-
131,662.00 $
Colour: |
White |
Dimension: |
197(h) x 85(w) x 92.5(d) cm |
Battery Runtime: |
13.5 mins |
Availability: |
Ex-stock (Special order) |
-
155,313.00 $
Colour: |
White |
Dimension: |
197(h) x 85(w) x 92.5(d) cm |
Battery Runtime: |
10 mins |
Availability: |
Ex-stock (Special order) |
-
1,907.00 $
Colour: |
White |
Dimension: |
65(h) x 50(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
8 – 10 Weeks |
-
2,180.00 $
Colour: |
White |
Dimension: |
65(h) x 50(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
8 – 10 Weeks |
-
4,305.00 $
Colour: |
White |
Dimension: |
100(h) x 75(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
Ex-stock |
-
3,106.00 $
Colour: |
White |
Dimension: |
80(h) x 50(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
12 – 16 Weeks from order |
-
1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |
-
75.40 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
15.5(h) x 13(w) x 19.5(d) cm |
Availability: |
Ex-stock |
-
14.30 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
10.1(h) x 7(w) x 9(d) cm |
Availability: |
Ex-stock |
-
165.10 $
Type: |
Battery |
Nominal Voltage: |
12V |
Dimension: |
20.6(h) x 16.6(w) x 25.8(d) cm |
Availability: |
Ex-stock |