Showing 1–12 of 22 results
-
4,305.00 $
Colour: |
White |
Dimension: |
100(h) x 75(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
Ex-stock |
-
3,106.00 $
Colour: |
White |
Dimension: |
80(h) x 50(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
12 – 16 Weeks from order |
-
4,470.00 $
Colour: |
White |
Dimension: |
197(h) x 70(w) x 85(d) cm |
Compatible with: |
Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
Availability: |
Ex-stock (till stock last) |
-
5,177.00 $
Colour: |
White |
Dimension: |
197(h) x 110(w) x 85(d) cm |
Compatible with: |
Galaxy VL UPS(GVL400K500DS, GVL500KDS) |
Availability: |
Ex-stock (till stock last) |
-
1,800.00 $
Colour: |
Black |
Dimension: |
43.2(h) x 13(w) x 68.27(d) cm |
Mounting Mode: |
Rack-mounted with kit |
Compatible with: |
SRT5KRMXLW-HW |
Availability: |
Ex-stock |
-
27,184.00 $
Physical: |
155.4(h) x 100.1(w) x 100.1(d) cm |
Input Voltage: |
400 V |
Compatible Indoor Units: |
ACRD301S and ACRD301P |
Availability: |
12 weeks (Ex-stock until stock last) |
-
22,956.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
Input Power: |
850 W |
Compatible Outdoor Unit: |
ACCU30201 |
Compatible Sensing Cable: |
NBES0308 |
Availability: |
12 weeks (Ex-stock until stock last) |
-
25,440.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
Input Power: |
850 W |
Compatible Outdoor Unit: |
ACCU30201 |
Compatible Sensing Cable: |
NBES0308 |
Availability: |
12 weeks (Ex-stock until stock last) |
-
10,190.00 $
Physical: |
68.6(h) x 90.1(w) x 45.7(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
12 weeks (Ex-stock until stock last) |
-
20,273.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
U Size: |
42U |
Mounting Mode: |
Not rack-mountable |
Availability: |
13 weeks (Ex-stock until stock last) |
-
2,234.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
Ex-stock |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…