Showing 1–12 of 13 results
-
78,500.00 $
Colour: |
White |
Physical: |
197(h) x 60(w) x 85(d) cm |
Type: |
External battery system |
Battery Runtime: |
13.5 mins (at 400kW unit load) |
Availability: |
Ex-stock until stock last (Special order) |
-
93,243.00 $
Colour: |
White |
Physical: |
197(h) x 100(w) x 85(d) cm |
Type: |
External battery system |
Battery Runtime: |
10 mins (at 500kW unit load) |
Availability: |
Ex-stock until stock last (Special order) |
-
28,297.00 $ – 33,352.00 $
Colour: |
Black |
Physical: |
199.1(h) x 60(w) x 85(d) cm |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
Setup: |
Choose (Switches) |
-
5,395.00 $
Compatible with: |
Easy UPS 3-Phase |
Colour: |
White |
Mounting Type: |
Wall Mount |
Dimension: |
105(h) x 75(w) x 35(d) cm |
Availability: |
In stock |
-
20,164.00 $
Compatible with: |
Galaxy VL |
Colour: |
White |
Dimension: |
197(h) x 50(w) x 84.7(d) cm |
Availability: |
8 Weeks (Until stock last) |
-
1,853.00 $ – 2,044.00 $
Compatible with: |
Galaxy VS and Easy UPS 3S |
Colour: |
White |
Mounting Type: |
Wall Mount |
Availability: |
Back order (4 – 8 Weeks) |
Load: |
Choose |
-
8,085.00 $
Compatible with: |
Galaxy VS, Easy 3S and Easy 3M UPS |
Colour: |
White |
Mounting Type: |
Wall Mount |
Availability: |
Back order (4 – 8 Weeks) |
-
2,230.00 $ – 2,850.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
48U |
Availability: |
Ex-stock |
Dimension: |
2258(h) x 600(w) x Choose(d) cm |
-
2,620.00 $ – 3,340.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
48U |
Availability: |
Ex-stock |
Dimension: |
2258(h) x 800(w) x Choose(d) cm |
-
6,240.00 $
Colour: |
Black |
Physical: |
225.8(h) x 75(w) x 120(d) cm (48U) |
Weight: |
185.45kg |
Product Type: |
Rack Enclosure |
Number Of Rack Unit: |
48U |
Availability: |
Ex-stock |
-
3,540.00 $ – 4,610.00 $
Colour: |
Black |
Product Type: |
Rack Enclosure |
U Size: |
48U |
Availability: |
Ex-stock |
Dimension: |
225.8(h) x 60(w) x Choose(d) cm |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…