Showing 1–12 of 17 results
-
18,530.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
External battery system |
Availability: |
8 – 10 Weeks |
-
55,913.00 $ – 65,177.00 $
Colour: |
White |
Dimension: |
197(h) x 55(w) x 84.7(d) cm |
Type: |
UPS with internal battery strings |
Availability: |
Ex-stock |
Backup time: |
Choose (mins) |
-
35,430.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
UPS with external batteries |
Availability: |
Ex-stock |
-
5,395.00 $
Compatible with: |
Easy UPS 3-Phase |
Colour: |
White |
Mounting Type: |
Wall Mount |
Dimension: |
105(h) x 75(w) x 35(d) cm |
Availability: |
In stock |
-
4,305.00 $
Colour: |
White |
Dimension: |
100(h) x 75(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
Ex-stock |
-
3,106.00 $
Colour: |
White |
Dimension: |
80(h) x 50(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
12 – 16 Weeks from order |
-
1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-
2,180.00 $
Colour: |
Black |
Physical: |
4.4(h) x 43.2(w) x 23.6(d) cm (1U) |
Weight: |
3.93kg |
Mount Location: |
Front |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
2,123.00 $ – 2,260.00 $
Colour: |
Black |
U Size: |
1U |
Mount Location: |
Front |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
2,613.00 $
Colour: |
Black |
Physical: |
8.8(h) x 43.2(w) x 23.6(d) cm (2U) |
Weight: |
6.94kg |
Mount Location: |
Front / Rear |
Mounting Mode: |
Rack-mounted |
Availability: |
Ex-stock |
-
1,880.00 $
Type: |
Battery module |
Dimension: |
15.7(h) x 42.8(w) x 76(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
3 weeks |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…