-
528.00 $
Additional Backup Time: |
10 Minutes |
Physical: |
33.6 (h) x 19 (w) x 42.5cm (d) (2U) |
Weight: |
38kg |
Rail Kit: |
Tower Case |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
415.00 $
Additional Backup Time: |
30 Minutes |
Physical: |
8.6 (h) x 43.8 (w) x 41.2cm (d) (2U) |
Weight: |
21kg |
Rail Kit: |
Included |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
1,520.00 $
Colour: |
Black |
Dimension: |
90.2(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Availability: |
Ex-stock (2 – 4 Weeks) |
-
586.00 $
Colour: |
Black |
Dimension: |
161.9(h) x 5.6(w) x 4.4(d) cm |
U Size: |
0U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Side |
Mounting Position: |
Vertical |
Availability: |
Ex-stock (4 – 6 Weeks) |
-
185.00 $ – 433.00 $
Colour: |
Black |
U Size: |
1U |
Mounting Mode: |
Rack Mountable |
Mounting Location: |
Front / Rear |
Availability: |
Ex-stock (6 – 8 Weeks) |
Output: |
Choose (C13) |
-
44.00 $
Compatible With: |
Single Phase Easy SRV 5KVA models and above |
Physical: |
2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
80.00 $
Compatible With: |
Single Phase Easy SRV models only |
Physical: |
2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
572.00 $
Compatible With: |
Smart-UPS series (SRT, SMT, SMX, SURT, SUM
SURTD), Symmetra series (SYA, SYAF) |
Physical: |
3.8(h) x 12.1(w) x 11.4(d) cm |
Weight: |
0.08kg |
Availability: |
Back order (6 – 8 Weeks) |
-
433.00 $
Compatible With: |
Easy 3S, 3M, 3L and Galaxy PW 2nd Gen UPS |
Physical: |
12.7(h) x 20.3(w) x 12.7(d) cm |
Weight: |
0.91kg |
Availability: |
Back order (6 – 8 Weeks) |
-
600.00 $
Compatible With: |
Easy UPS 3S, Easy UPS 3M, Easy UPS 3L |
Physical: |
4.4(h) x 5.2(w) x 8.0(d) cm |
Weight: |
0.05kg |
Availability: |
Ex-stock until stock last (5 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
436.00 $
Type: |
Battery |
Color: |
Grey |
Physical: |
23.9(h) x 17.2(w) x 30.9(d) cm |
Availability: |
6 – 8 weeks |