Showing 1–12 of 16 results
-
18,530.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
External battery system |
Availability: |
8 – 10 Weeks |
-
55,913.00 $ – 65,177.00 $
Colour: |
White |
Dimension: |
197(h) x 55(w) x 84.7(d) cm |
Type: |
UPS with internal battery strings |
Availability: |
Ex-stock |
Backup time: |
Choose (mins) |
-
35,430.00 $
Colour: |
White |
Dimension: |
148.5(h) x 52.1(w) x 84.7(d) cm |
Type: |
UPS with external batteries |
Availability: |
Ex-stock |
-
1,645.00 $
Colour: |
Black |
Dimension: |
13(h) x 44(w) x 68.3(d) cm |
Mounting Mode: |
Rack-mounted |
U Size: |
3U |
Compatible with: |
SRTG10KXLI |
Availability: |
Ex-stock |
-
27,184.00 $
Physical: |
155.4(h) x 100.1(w) x 100.1(d) cm |
Input Voltage: |
400 V |
Compatible Indoor Units: |
ACRD301S and ACRD301P |
Availability: |
12 weeks (Ex-stock until stock last) |
-
22,956.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
Input Power: |
850 W |
Compatible Outdoor Unit: |
ACCU30201 |
Compatible Sensing Cable: |
NBES0308 |
Availability: |
12 weeks (Ex-stock until stock last) |
-
25,440.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
Input Power: |
850 W |
Compatible Outdoor Unit: |
ACCU30201 |
Compatible Sensing Cable: |
NBES0308 |
Availability: |
12 weeks (Ex-stock until stock last) |
-
10,190.00 $
Physical: |
68.6(h) x 90.1(w) x 45.7(d) cm |
Mounting Mode: |
Not rack-mountable |
Availability: |
12 weeks (Ex-stock until stock last) |
-
20,273.00 $
Colour: |
Black |
Physical: |
199.1(h) x 30(w) x 109.5(d) cm |
U Size: |
42U |
Mounting Mode: |
Not rack-mountable |
Availability: |
13 weeks (Ex-stock until stock last) |
-
44.00 $
Compatible With: |
Single Phase Easy SRV 5KVA models and above |
Physical: |
2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
80.00 $
Compatible With: |
Single Phase Easy SRV models only |
Physical: |
2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…