Showing 13–20 of 20 results
-
17,310.00 $
Colour: |
White |
Physical: |
140(h) x 50(w) x 96.9(d) cm |
Type: |
Internal Modular battery string |
Battery String: |
3 internal 7Ah (Expandable To 4) |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
12,660.00 $
Colour: |
White |
Physical: |
140(h) x 50(w) x 99.6(d) cm |
Type: |
Internal battery system (Supplied without batteries) |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
18,860.00 $
Colour: |
White |
Physical: |
140(h) x 50(w) x 96.9(d) cm |
Type: |
Internal Modular battery string |
Battery String: |
4 internal 7Ah |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
28,297.00 $ – 33,352.00 $
Colour: |
Black |
Physical: |
199.1(h) x 60(w) x 85(d) cm |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
Setup: |
Choose (Switches) |
-
44.00 $
Compatible With: |
Single Phase Easy SRV 5KVA models and above |
Physical: |
2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
80.00 $
Compatible With: |
Single Phase Easy SRV models only |
Physical: |
2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |