Maintenance Bypass Panel, single unit, 10-400kVA 400V wall mount, for Easy UPS 3-Phase
5,395.00 $Compatible with: | Easy UPS 3-Phase |
Colour: | White |
Mounting Type: | Wall Mount |
Dimension: | 105(h) x 75(w) x 35(d) cm |
Availability: | In stock |
Showing all 8 results
Compatible with: | Easy UPS 3-Phase |
Colour: | White |
Mounting Type: | Wall Mount |
Dimension: | 105(h) x 75(w) x 35(d) cm |
Availability: | In stock |
Colour: | Black |
Physical: | 199.1(h) x 30(w) x 109.5(d) cm |
U Size: | 42U |
Mounting Mode: | Not rack-mountable |
Availability: | 13 weeks (Ex-stock until stock last) |
Colour: | Black |
Dimension: | 90.2(h) x 5.6(w) x 4.4(d) cm |
U Size: | 0U |
Mounting Mode: | Rack Mountable |
Mounting Location: | Side |
Availability: | Ex-stock (2 – 4 Weeks) |
Colour: | Black |
Dimension: | 161.9(h) x 5.6(w) x 4.4(d) cm |
U Size: | 0U |
Mounting Mode: | Rack Mountable |
Mounting Location: | Side |
Mounting Position: | Vertical |
Availability: | Ex-stock (4 – 6 Weeks) |
Colour: | Black |
U Size: | 1U |
Mounting Mode: | Rack Mountable |
Mounting Location: | Front / Rear |
Availability: | Ex-stock (6 – 8 Weeks) |
Output: | Choose (C13) |
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
Type: | Maintenance |
Support: | Easy UPS 3S |
Availability: | Ex-stock |
UPS rating: | Choose (kVA) |
Type: | Water leakage sensor |
Dimension: | 7(h) x 17.1(w) x 16.1(d) cm |
Compatible with: | InRow RC, InRow RD and other NetBotz appliances |
Availability: | 12 – 13 Weeks |