-
78,500.00 $
Colour: |
White |
Physical: |
197(h) x 60(w) x 85(d) cm |
Type: |
External battery system |
Battery Runtime: |
13.5 mins (at 400kW unit load) |
Availability: |
Ex-stock until stock last (Special order) |
-
93,243.00 $
Colour: |
White |
Physical: |
197(h) x 100(w) x 85(d) cm |
Type: |
External battery system |
Battery Runtime: |
10 mins (at 500kW unit load) |
Availability: |
Ex-stock until stock last (Special order) |
-
44.00 $
Compatible With: |
Single Phase Easy SRV 5KVA models and above |
Physical: |
2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
80.00 $
Compatible With: |
Single Phase Easy SRV models only |
Physical: |
2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
572.00 $
Compatible With: |
Smart-UPS series (SRT, SMT, SMX, SURT, SUM
SURTD), Symmetra series (SYA, SYAF) |
Physical: |
3.8(h) x 12.1(w) x 11.4(d) cm |
Weight: |
0.08kg |
Availability: |
Back order (6 – 8 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
33.00 $
Primary Models: |
SRV1KRILRK & SRV36RLBP-9A |
Weight: |
0.295kg |
Availability: |
Ex-stock / back order 4-6 weeks |