-
4,305.00 $
Colour: |
White |
Dimension: |
100(h) x 75(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
Ex-stock |
-
3,106.00 $
Colour: |
White |
Dimension: |
80(h) x 50(w) x 28(d) cm |
Mounting Type: |
Wall mounted |
Availability: |
12 – 16 Weeks from order |
-
528.00 $
Additional Backup Time: |
10 Minutes |
Physical: |
33.6 (h) x 19 (w) x 42.5cm (d) (2U) |
Weight: |
38kg |
Rail Kit: |
Tower Case |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
415.00 $
Additional Backup Time: |
30 Minutes |
Physical: |
8.6 (h) x 43.8 (w) x 41.2cm (d) (2U) |
Weight: |
21kg |
Rail Kit: |
Included |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
44.00 $
Compatible With: |
Single Phase Easy SRV 5KVA models and above |
Physical: |
2.6 (h) x 5.2 (w) x 8.4cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
80.00 $
Compatible With: |
Single Phase Easy SRV models only |
Physical: |
2.6 (h) x 5.24 (w) x 8.0cm (d) |
Weight: |
0.1kg |
Availability: |
Ex-stock until stock last (back order 4-6 weeks) |
-
572.00 $
Compatible With: |
Smart-UPS series (SRT, SMT, SMX, SURT, SUM
SURTD), Symmetra series (SYA, SYAF) |
Physical: |
3.8(h) x 12.1(w) x 11.4(d) cm |
Weight: |
0.08kg |
Availability: |
Back order (6 – 8 Weeks) |
-
3,269.00 $
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…
-
2,720.00 $ – 2,940.00 $
Type: |
Maintenance |
Support: |
Easy UPS 3S |
Availability: |
Ex-stock |
UPS rating: |
Choose (kVA) |