Battery Breaker Box, two 630A DC breakers, for Galaxy VS/VL, Easy UPS 3-Phase Modular, and Easy UPS 3M Advanced
4,305.00 $Colour: | White |
Dimension: | 100(h) x 75(w) x 28(d) cm |
Mounting Type: | Wall mounted |
Availability: | Ex-stock |
Showing all 10 results
Colour: | White |
Dimension: | 100(h) x 75(w) x 28(d) cm |
Mounting Type: | Wall mounted |
Availability: | Ex-stock |
Backup Time: | 08 Minutes |
Physical: | 22 (h) x 43.8 (w) x 61.5cm (d) (4U) |
Weight: | 78kg |
External Battery Pack: | 01 |
Rail Kit: | Included for all |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Backup Time: | 15 Minutes |
Physical: | 17.2 (h) x 43.8 (w) x 41.2cm (d) (4U) |
Weight: | 27kg |
External Battery Pack: | 01 |
Rail Kit: | Included for all |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Backup Time: | 22 Minutes |
Physical: | 17.2 (h) x 43.8 (w) x 63.2cm (d) (4U) |
Weight: | 27kg |
External Battery Pack: | 01 |
Rail Kit: | Included for all |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Backup Time: | 13 Minutes |
Physical: | 17.2 (h) x 43.8 (w) x 63.2cm (d) (4U) |
Weight: | 52kg |
External Battery Pack: | 01 |
Rail Kit: | Included for all |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Backup Time: | 11 Minutes |
Physical: | 21.95 (h) x 43.8 (w) x 61.5cm (d) (4U) |
Weight: | 78kg |
External Battery Pack: | 01 |
Rail Kit: | Included for all |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Backup Time: | 06 Minutes |
Physical: | 22 (h) x 43.8 (w) x 61.5cm (d) (4U) |
Weight: | 78kg |
External Battery Pack: | 01 |
Rail Kit: | Included for all |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
Backup Time: | 10 Minutes |
Physical: | 13.3 (h) x 43.8 (w) x 60.6cm (d) (3U) |
Weight: | 63kg |
External Battery Pack: | 01 |
Rail Kit: | Included for all |
Availability: | Ex-stock |
Additional Backup Time: | 10 Minutes |
Physical: | 13.3 (h) x 43.8 (w) x 60.6cm (d) (3U) |
Weight: | 63kg |
Rail Kit: | Included |
Availability: | Ex-stock until stock last (back order 4-6 weeks) |
1. Planning and Preparation Site Survey: Assess the installation site for adequate space, ventilation, and access. Load Assessment: Determine the total load requirements to ensure the UPS can support the necessary equipment. Permits and Compliance: Obtain necessary permits and ensure compliance with local electrical codes. 2. Equipment and Tools Needed UPS unit Battery bank (if…